SPECIFICATION

GENERAL ITEMS
  • All relevant aspects of Part A to Part M of the building regulations will be adhered to.
  • Sound Insulation will be in line with IS Standards i.e. ISO 16283 Part 1 and Part 2 series.
  • A DEAP analysis will be carried out to achieve NZEB requirements.
STRUCTURE
  • Block walls with insulation or timber frame as specified by the Engineer to comply with the current building regulations.
  • Concrete floors at ground level.
  • Oriented Strand Board at first floor.
  • Prefabricated roof trusses.
INTERNAL FINISHES
  • Skimmed plaster finish on Timber Frame party wall.
  • Skimmed plasterboard on all other walls including timber stud walls.
  • Wall tiling to bath, ensuite, downstairs wheelchair accessible WC and splashback in kitchen.
INTERNAL FINISHES CONT’D
  • Foil wrapped kitchen units as per drawing.
  • Foil wrapped wardrobe units as per drawing.
  • Painted doors, skirting & architrave.
  • Tiled shower area to ensuites.

 

EXTERNAL FINISHES
  • Rendered external walls as indicated on drawings.
  • Upvc Future Proof windows and Ultratech Front doors with timber sidelights to required
  • U values as per building regulations.
  • Timber 3 point locking front door.
  • Upvc fascias, soffits, gutters and downpipes.
  • Flat concrete roof tile black / grey (with mechanically fixed ridges and eave as per guidelines).
  • Seeded front & back gardens.
  • The site will be ducted for future broadband provision.

 

MECHANICAL HEATING
  • Air to water heat pump with radiators throughout